Ditch-witch JT2020 Manuel d'utilisateur Page 101

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 203
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 100
Conduct a Bore - 100 JT2020 Mach 1 Operator’s Manual
Drill First Pipe
CMW
Drill First Pipe
1. Turn on drilling fluid.
2. Set flow control to desired flow/pressure. See “Start System” on page 93.
3. Turn drill bit to starting position. See “Prepare Entry Point” on page 76.
4. Slowly move carriage forward. Drill in downhole tools and 1/3 of first pipe before steering.
5. Monitor gauges.
Turning shaft can kill you or crush arm or leg. Stay away.
NOTICE:
Keep everyone at least 10’ (3 m) away from turning drill string.
Push rod or pipe slowly. Forcing can bend string. Do not use bent rod or pipe.
Jobsite hazards could cause death or serious injury. Use
correct equipment and work methods. Use and maintain proper safety
equipment.
Vue de la page 100
1 2 ... 96 97 98 99 100 101 102 103 104 105 106 ... 202 203

Commentaires sur ces manuels

Pas de commentaire